Drawing E08-03 (Continued) Test Points

Area

Point

Equipment Tested P-483 (Above DC)

Test Value (Ohms)

Grounded Circuit Used

3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11)

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99

0.68 0.71 0.55 0.59 0.39 0.54 0.55 0.51 1.43 0.71 0.46 0.45 5.37 0.47 1.70 0.40 0.41 0.67 1.11 1.26 1.33

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A

DC Tank Elevator

Airline Tank 2 Tank 3

A Compactor

A Compactor Motor

Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17)

YPS Feeder

Mixing Screw

YPS Disconnect

Additive Feeder Disconnect

Dust Collector Tank Dust Collector Motor

Lighting Panel 1 Lighting Panel 2

XFMR

XFMR Disconnect

Dust Collector Disconnect

Outside Dust Collector

100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115

Outside Dust Tank

Vac Pan Silo Housing

N/A

Vac Pan Silo Tank

1.77

Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20)

Panel D

0.36 0.51 0.27 0.27

Lighting XFMR Disconnect

Lighting Panel 4 Lighting Panel 2 Lighting Panel 3

N/A

Lighting XFMR

0.27 0.27 0.31 3.75 2.90

Switchgear

Maintenance Disconnect

Lighting Panel 1

Welding Disconnect 1

Welding Frame

1000.00

Welding Disconnect 2 Welding Disconnect 3

6.40 2.84

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 12 of 23

INTERSTATES MONTH XX, XXXX