Grounding Audit Report | Interstates

Grounding Audit Report

Grounding Audit Report

CLIENT NAME FACILITY LOCATION

Revision XX – DATE

By: Corey Hoffman, PM Jesse DeBoom, Project Engineer Interstates Engineering, Inc. Sioux Center, Iowa IE Job #: XXX-XXX-XXXX

Revisions & Table of Contents

Revisions:

Revision

Date

Prepared By Reviewed By

Comments

Table of Contents:

Section 1: Project Overview

Executive Summary

Scope of Work Clarifications

Section 2: Results

Recommendations Test Point Tables

Section 3: Appendices

Appendix A: Planview Drawings

Appendix B: Photos

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 2 of 23

INTERSTATES MONTH XX, XXXX

Grounding Audit Client Name – Facility Location

Executive Summary

The following document presents the results of a site grounding audit performed by Jesse DeBoom with Interstates on Date. Site Escort from Client Name in Facility Location was the facility’s escort during the onsite grounding audit. Recommendations were created from these results to ensure safe grounding of equipment throughout the entire facility. During the onsite grounding system audit, we tested 287 points. These points included, but were not limited to, items such as ground whips, electrical equipment, building steel and equipment structural steel. Overall, the grounding system, which could be verified, seemed to be in good condition. All systems, which should be connected to the grounding system, were connected at the Facility Location facility. There was 1 point tested which had a High Ohm reading, and 15 points tested which had a Critical Ohm reading. There were also 10 points tested that would not produce a reading, indicating there is no or an extremely poor ground connection. Recommendations for the 26 points indicated above and any additional grounding issues noted while on site have been made below.

Scope of Work

This grounding audit is being undertaken at the request of Client Name to analyze the grounding system in the facility in conjunction with safety standards. The scope of work for this project was to complete the following: 1. Confirm that systems which should be grounded are grounded. 2. A visual inspection of the current grounding of the system. 3. Ground resistance tests via a clamp on ground resistance tester to be taken at any available ground whips and rods going to ground. 4. Ground continuity tests via a point to point continuity tester to be taken at all available gear going to ground. The following is a list of equipment tested: Switchboards, Switchgears, Conduit, Stand Alone Starters, Process equipment, Exposed Structural Steel, Electrical Outlets, Junction Boxes, and Portable Process Equipment 5. A written report with recommendations based on the results and observations. 6. Provide planviews to indicate the area in which test points were taken. 7. Test point tables to indicate all recorded measurements.

Clarifications

Analysis Using an AEMC Model 6424 Ground Tester (Test Current: 200mA – 250mA), the continuity between two conductive parts or the continuity to a main earthing terminal was measured at all major pieces of equipment in the electric rooms and most of the equipment in the production areas. This was done by using a known ground reference and confirming the continuity between the ground reference and the piece of equipment being tested. This confirms that the equipment in question is connected to the grounding system.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 3 of 23

INTERSTATES MONTH XX, XXXX

Using an AEMC 6416 Clamp-On Ground Resistance Tester (Test Current: 1mA – 30A), the resistance to ground was measured at all accessible ground whips. A clamp-on ground resistance meter is effective in measuring the resistance at any point in the grounding system to earth but will not provide accurate readings if the meter is measuring a closed loop of the grounding system. However, for the purposes of this audit, this method was sufficient in identifying points where a grounding connection was ineffectively grounded to earth or was disconnected from the ground loop. The recommended standard target for grounding is 5.00 Ohms or less for ground resistance which is under the NEC required value and 0.50 Ohms or less for Point to Point resistance. The planview drawings in Appendix A: Planview Drawings indicate all areas where grounds were tested, and Table 1: Test Point Table indicate the ground resistance and continuity values that were measured. In regards to the magnet equipment, issues were found on site and suggestions, as well as actions, were discussed on site to remediate the bad ohm readings. The system was grounded from the steal frame with no jumper from the already solidly bonded frame to a steal handguard. A jumper was installed to properly ground the frame, the metal detector, and the surrounding chutes.

Conditions The Ambient Temperature of the areas on the days the grounding audit was conducted are as follows:

• Electric Rooms: 75° F • Outside Areas: 45° F • Bagging/ Production Area: 65° F • Warehouse: 85° F

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 4 of 23

INTERSTATES MONTH XX, XXXX

Section 2: Results Recommendations

The following recommendations are made based on the observations and measurements taken on site. The points indicated can be referenced on Table 1: Test Point Tables .

Drawing E08-02

Required Action: 1. The Micro A/C Blower in the Micro MCC Room (Area 6) had a reading of 22 Ohms. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground bar inside the enclosures. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the enclosure’s grounding connection. (Point 25) Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Point 25)

Drawing E08-03

Required Action: 1. The Dust Collector Piping in the Micro 3 Floor (Area 2) had a reading of 49.60 Ohms. We recommend ensuring there is a ground wire connected to the Dust Collector Piping and it is secure and free from damage. If not, we recommend connecting a #6 THWN bonding jumper across bolted connections where there may not be a good steel on steel connection. (Point 21) Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Point 21) 2. The Micro Salt Feeder Platform in the Micro 3 Floor (Area 2) had a reading of N/A, meaning there is an extremely poor or no connection to the grounding system. We recommend checking to ensure there are ground connections to building steel and that all steel to steel connections are secure. If not, we recommend connecting a #6 THWN bonding jumper to the nearest steel column or grounding connection. (Point 23) Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Point 23) 3. The Newlong Scale Feed Chute in the Micro 3 Floor (Area 2) had a reading of N/A, meaning there is an extremely poor or no connection to the grounding system. We recommend checking to ensure there are ground connections to building steel and that all steel to steel connections are secure. If not, we recommend connecting a #6 THWN bonding jumper to the nearest steel column or grounding connection. (Point 25) Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Point 25) 4. The Newlong Vibratory Feed Conveyor Tray in the Micro 3 Floor (Area 2) had a reading of N/A, meaning there is an extremely poor or no connection to the grounding system. We recommend checking to ensure there are ground connections to building steel and that all steel to steel connections are secure. If not, we recommend connecting a #6 THWN bonding jumper connected to the Vibratory Conveyor steel frame. (Point 27) Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Point 27)

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 5 of 23

INTERSTATES MONTH XX, XXXX

5. There were 4 points in Micro 2 Floor (Area 3) that had readings of N/A, 63, N/A and 60 Ohms. The facility was currently working on installing a grounding rod to ensure that points 55, 56, 58 and 59 are properly grounded and will be sending the updated readings upon completion of the install. Cargill has noted this recommendation has been completed. An updated Ohm reading was not provided. (Points 55-56, 58-59) 6. The 2F XFMR in the Screener Machine Area (Area 10) had a reading of N/A. We recommend ensuring the green ground wire which should be ran with the power cables to the ground bar inside the enclosure is tight and free from corrosion. We also recommend ensuring the N-G Bond inside the XMFR is connected directly to the earth grounding system. (Point 70) 7. The MCC 2F Capfuse in the Screener Machine Area (Area 10) had a reading of 41 Ohms. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground bar inside the enclosure. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the enclosures ground bar. (Point 71) 8. The Dust Collector Tank in the Bulk Area (Area 17) had a reading of 5.37 Ohms. We recommend ensuring there is a ground wire connected to the steel frame of the tank and it is secure and free from corrosion and damage. If not, a new green #6 THWN ground wire will need to be connected to the nearest ground whip or building steel to the steel frame of the tank. (Point 92) 9. The Vac Pan Silo Housing in the Bulk Area (Area 17) had a reading of N/A, meaning there is an extremely poor or no connection to the grounding system. We recommend checking to ensure there are ground connections to the Vac Pan Silo Housing and that all steel to steel connections are secure. If not, we recommend connecting a #6 THWN ground wire will need to be connected to the nearest ground whip or building steel to the steel frame of the Vac Pan Silo Housing. (Point 100) 10. Lighting Panel 3 in the Maintenance Area (Area 20) had a reading of N/A, meaning there is an extremely poor or no connection to the grounding system. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground bar inside the panel and it is bonded to the panels casing. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the enc losure’s ground bar or the enclosure’s casing itself. (Point 107) 11. The Welding Frame in the Maintenance Area (Area 20) had a reading of 1,000 Ohms. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the receptacle that the welder is being plugged into. If the ground in the receptacle is good, we recommended checking the cord connection to the welder itself. (Point 113) 12. The Welding Disconnect 2 in the Maintenance Area (Area 20) had a reading of 6.40 Ohms. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground bar inside the enclosure. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the disconnects grounding connection. (Point 114)

Drawing E08-04

Required Action: 1. The #3 Circulating Pump in the MCC Room Vac Pan (Area 13) had a reading of N/A meaning that it is not connected to the grounding system. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground lug inside the pump termination enclosure. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the pump enclosure’s grounding connection. (Points 32) 2. There were two ground whips at Cooling Area (Area 16) that had readings between 119 Ohms and 365 Ohms. We recommend ensuring the connections to the ground rods and equipment is tight and free from corrosion. If this connection is properly made, then we recommend driving a ground rod approximately 10-15ft away and connecting the two ground rods with a 2/0 green THWN ground wire. (Points 73 – 74)

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 6 of 23

INTERSTATES MONTH XX, XXXX

3. The Filter Wheel Motor in the Vac Pan Area (Area 18) had reading of 9.50 Ohms. We recommend ensuring the ground wire that should be pulled in with the power cables is securely connected to the ground lug inside the motor termination enclosure. If not, a new green THWN ground wire, sized per NEC, will need to be pulled and connected to the enclosure’s grounding connection. (Points 88)

Drawing E08-05

Required Action: 1. Tank 4 in the Brine Tanks Area (Area 21) had a reading of 11.56 Ohms. We recommend ensuring there is a ground wire connected to the steel frame of the tank and it is secure and free from damage and corrosion. If not, a new green #6 THWN ground wire will need to be connected to the nearest ground whip or building steel to the steel frame of the tank. (Point 1) 2. Tank 7 in the Brine Tanks Area (Area 21) had a reading of 10.90 Ohms. We recommend ensuring there is a ground wire connected to the steel frame of the tank and it is secure and free from damage and corrosion. If not, a new green #6 THWN ground wire will need to be connected to the nearest ground whip or building steel to the steel frame of the tank. (Point 3) 3. The Step Frame in the Brine Tanks Area (Area 21) had a reading of 900 Ohms. We recommend ensuring there is a ground wire connected to the steel frame and it is secure and free from damage. If not, a new green #6 THWN ground wire will need to be connected to the nearest ground whip or building steel to the step frame if there is any electrical components mounted to the frame. (Point 7)

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 7 of 23

INTERSTATES MONTH XX, XXXX

Section 2: Test Point Tables

The following tables show the values measured at each grounding test point. Note that some of the test points in the tables correspond to a point on the drawings of Appendix A: Planview Drawings . Note: Points with a value of N/A under the “Test Value (Ohms)” indicates a po int that did not give a reading when tested. Points with a value of N/A under the “Grounded Circuit Used” column indicates a ground whip connected di rectly to the grounding system.

Below is a chart to that indicates recommended guidelines on equipment tested for continuity and resistance.

Severity Criteria – Ground Resistance Measurement Ground Resistance Resistance Measurement

No deficiency

High

Critical

Severity:

Resistance of the Earthing Rod to Ground/Earth

4.0 - 5.0 Ohms

< 4.0 Ohms

> 5.0 Ohms

Severity Criteria – Grounding/Bonding Continuity Measurement Grounding/Bonding Continuity Resistance Measurement Severity: No deficiency High Critical Resistance of a bonding path from any point in the grounding system to a ground connection < 4.0 Ohms 4.0 - 5.0 Ohms > 5.0 Ohms

Point-to-Point Resistance

< 0.5 Ohms

-

> 0.5 Ohms

Any reading over 5 Ohms is considered Critical and a recommendation will have been made for that test point. Test points that are between 4-5 Ohms are considered high and need to be monitored for any change.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 8 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-02 Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Pellet DC MCC Room (Area 4) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Bulk MCC Room (Area 5) Micro MCC Room (Area 6) Micro MCC Room (Area 6) Micro MCC Room (Area 6) Micro MCC Room (Area 6) Roundcan MCC Room (Area 7) Roundcan MCC Room (Area 7) Roundcan MCC Room (Area 7) Roundcan MCC Room (Area 7)

1 2 3 4 5 6 7 8 9

DC MCC Room Air Conditioner

0.34 0.30 0.65 0.36 0.40 0.42 0.34 0.39 0.32 0.36 0.33 0.37 0.55 0.46 0.36 0.41 0.35 0.35 0.44 0.68 0.42 0.34

Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept by Air Conditioner, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A Recept for Emergency Light, CB# N/A

PLC P-0

MCC 1CA

Lighting Panel M

MCC 2D

Lighting Panel 1CA XFMR

DC MCC Mains Feed

XFMR 1CA XFMR 1CB

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Lighting Panel Sub-S

PLC M-0 MCC 2H MCC 1CB

Eriez Control Panel

PLC R-1

PLC M-1 PLC P-1 PLC Q-0

Bulk MCC Room Air Conditioner

MCC 1M

Pellet Bin Vibratory Conveyor Panel

Communication Node Panel

Micro MCC

0.97 1.09

Closest Recept in Micro MCC Room, CB# N/A Closest Recept in Micro MCC Room, CB# N/A Closest Recept in Micro MCC Room, CB# N/A Closest Recept in Micro MCC Room, CB# N/A Recept on Column Outside Room, CB# N/A Recept on Column Outside Room, CB# N/A Recept on Column Outside Room, CB# N/A Recept on Column Outside Room, CB# N/A

Micro A/C Disconnect

Micro A/C Blower

22.00*

Micro A/C Condenser

1.36

Roundcan MCC Room Air Conditioner

4.70 3.50 3.50 3.55

MCC 1H

Old Dairymill MCC Main

RMCC Data Cabinet

Grain MCC Room (Area 8)

N/A

Equipment in this area is being demoed

N/A

N/A

Battery Charger MCC Room (Area 9) Battery Charger MCC Room (Area 9)

31 32

MCC 2F

2.10 1.86

Unknown Panel, CB# N/A Unknown Panel, CB# N/A

110 Panel

*Original Ohm reading is showing for point 25. Corrective actions have been completed for this item, but an updated Ohm reading wasn't provided.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 9 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-03 Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Outside Silos Top Floor (Area 1) Outside Silos Top Floor (Area 1) Outside Silos Top Floor (Area 1) Outside Silos Top Floor (Area 1) Outside Silos Top Floor (Area 1) Outside Silos Top Floor (Area 1)

1 2 3 4 5 6 7 8 9

Outside Silo Distribution Screw Outside Silo Elevator Chutes #1 Granulated Return Screw Outside Silo Elevator Stairs Outside Silo Elevator Shaft

0.64 0.63 0.65 0.63 0.79 0.63 0.96 0.95 1.91 1.36 0.81 1.23 0.95 1.01 1.01 0.98 1.02 3.08 1.14 2.25

DMP-3 Lighting Recept in Silo Penthouse, CB# N/A DMP-3 Lighting Recept in Silo Penthouse, CB# N/A DMP-3 Lighting Recept in Silo Penthouse, CB# N/A DMP-3 Lighting Recept in Silo Penthouse, CB# N/A DMP-3 Lighting Recept in Silo Penthouse, CB# N/A DMP-3 Lighting Recept in Silo Penthouse, CB# N/A

Outside Silo Elevator Discharge Screw

Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2) Micro 3 Floor (Area 2)

Panel DMP-3 Enclosure

DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A DMP-3 Recept, CB# N/A

Fire System G Riser Ground Freight Elevator Door Micro Grinder Motor 1

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Micro Scalper

Micro Grinder Motor 2

Micro Blower

TCP Feeder

TCP Feeder Disconnect

Micro Incline Blending Screw

Micro Salt Feeder

Granulated Elevator - Abandoned

Pan Run Elevator

#2 Granulated Return Screw

Dust Collector Piping at Pan Run Mezzanine

49.60*

Micro Feed Chutes

0.88

Micro Salt Feeder Platform Pan Run Elevator Mezzanine Newlong Scale Feed Chute

N/A*

2.23

N/A*

Newlong Vibratory Feed Conveyor Frame Newlong Vibratory Feed Conveyor Tray

1.11

N/A* 1.18 1.16 1.15 1.41

Newlong Citric Hopper Duracube Citric Hopper Freight Elevator Motor

Freight Elevator Car

*Original Ohm reading is showing for points 21, 23, 25 and 27. Corrective actions have been completed for these items, but an updated Ohm reading wasn't provided.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 10 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-03 (Continued) Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3) Micro 2 Floor (Area 3)

32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79

Newlong Scale Cabinet

0.74 0.75 0.69 2.18 0.79 0.72 0.80 0.79 0.87 0.66 0.68 0.70 1.11 1.88 1.05 1.52 0.76 0.72 0.70 0.81 0.71 1.24 0.77 N/A*

DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A DMP-3 Lighting Recept by Newlong Scale Panel, CB# N/A

Newlong Scale Wire Raceway

Vacuum Unit

MCC Wire Raceway Newlong Scale Base Newlong Scale Hopper Newlong #2 Citric Feeder Newlong #1 Citric Feeder

Granulated Elevator Shaft - Abandoned

Pan Run Elevator Shaft

Roundcan Feed Screw - Abandoned

Lighting Panel DMP-2

XFMR for DMP-2 XFMR Disconnect

Bag Inflator Fan

Bag Inflator Disconnect

Compressed Air Pipe

Micro Baghouse Reverse Air Fan

Micro Baghouse Roundcan Tank

Roundcan Rotary Feeder

#3 Granulated Return Screw

Roundcan Mezzanine

Micro Inline Metal Detector Reject Chute Micro Inline Metal Detector Ground Whip

63.00*

Micro Inline Metal Detector Casing Micro Inline Metal Detector Frame

2.00

N/A*

Micro Inline Metal Detector Ground Strap Micro Inline Metal Detector Controller Head

60.00*

0.87 0.49 0.48 0.48 0.36 1.92 0.24 1.88 2.55 3.94

Micro Baghouse Manifold Drive Motor

Micro Grinder Outlet Chute

Dust Collector Piping at Baghouse Mezzanine

Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10) Screener Machine Area (Area 10)

P3VC4/3

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

XFMR

45 KVA XFMR

Palletizer Heaters Aisleway Heaters

2F Disconnect

2F XFMR

N/A

MCC 2F Capfuse

41.00

Nugget 120V Panel Production Screener Screener Disconnects

0.30 0.33 0.24 0.22 1.22 0.23 0.29 0.24

Hydraulic Unit Flake Breaker

Screener Elevator

P819 Motor

*Original Ohm reading is showing for points 55, 56, 58 and 59. Corrective actions have been completed for these items, but an updated Ohm reading wasn't provided.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 11 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-03 (Continued) Test Points

Area

Point

Equipment Tested P-483 (Above DC)

Test Value (Ohms)

Grounded Circuit Used

3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11) 3rd Floor Compactor Area (Area 11)

80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99

0.68 0.71 0.55 0.59 0.39 0.54 0.55 0.51 1.43 0.71 0.46 0.45 5.37 0.47 1.70 0.40 0.41 0.67 1.11 1.26 1.33

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A Panel #3 Recept, CB# N/A

DC Tank Elevator

Airline Tank 2 Tank 3

A Compactor

A Compactor Motor

Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17) Bulk Area (Area 17)

YPS Feeder

Mixing Screw

YPS Disconnect

Additive Feeder Disconnect

Dust Collector Tank Dust Collector Motor

Lighting Panel 1 Lighting Panel 2

XFMR

XFMR Disconnect

Dust Collector Disconnect

Outside Dust Collector

100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115

Outside Dust Tank

Vac Pan Silo Housing

N/A

Vac Pan Silo Tank

1.77

Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20) Maintenance Area (Area 20)

Panel D

0.36 0.51 0.27 0.27

Lighting XFMR Disconnect

Lighting Panel 4 Lighting Panel 2 Lighting Panel 3

N/A

Lighting XFMR

0.27 0.27 0.31 3.75 2.90

Switchgear

Maintenance Disconnect

Lighting Panel 1

Welding Disconnect 1

Welding Frame

1000.00

Welding Disconnect 2 Welding Disconnect 3

6.40 2.84

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 12 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-04 Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Transfer Switch Bank

Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) Switchgear Room (Area 12) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) MCC Room Vac Pan (Area 13) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14) Pump/Compressors Area (Area 14)

1 2 3 4 5 6 7 8 9

0.26 0.28 0.29 0.32 0.31 0.30 0.57 0.36 0.35 0.29 0.29 3.26 0.30 0.31 0.35 0.72 0.39 0.49 0.83 1.65 1.60 1.69 1.68 2.85 2.07 1.62 1.73 1.59 1.81 1.72 1.62

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

400 KVAR Cap 1D 400 KVAR Cap 2J

Subpanel SDP-2

800 A Lighting Panel

Sullair Panel Quincy Panel 4160 Switch 4160 XFMR

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Siemens Switchgear Left Siemens Switchgear Right Main Lighting 120V Panel

Ground Bar Main Switch

Switch #2 Switch #1 Switch #3

Feeder Switch

OH Edison Meter Equipment

Condensate Pump VFD

V-212

Brine Pump VFD

XFMR

Main Brine Pump

MCC 1K MCC 1J MCC 1A

Evaporator PLC

PLC-H2 PLC-H1 PLC-H0

#3 Circulating Pump

N/A

V-109/V-110

1.54 1.71 2.02 1.67 1.57 0.46 0.23 0.52 0.25 0.27 0.26 0.24 0.31 0.24 0.35 0.40 0.30 0.33 0.24 0.23 0.26 0.32 0.36

Slurry Pump VFD

Boiler VFD

MCC IG

Boiler PLC

RGS MCC 480V

RGS XFMR

RGS Lighting

Quincy Disconnect

Quincy Pullbox

Sullair Disconnect

Quincy A/C

Air Dryer

Sullair A/C

Transfer Pump Disconnect Transfer Pump Motor Packing Water B Motor Packing Water A Motor #2 Feedwater Pump #1 Feedwater Pump

Injection Pump

Main Brine Pump

Boilout Pump

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 13 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-04 (Continued) Test Points

Area

Point

Equipment Tested A-2A Lighting Panel

Test Value (Ohms)

Grounded Circuit Used

Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15) Boiler House Area (Area 15)

56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

0.34 0.30 0.26 0.32 0.40 0.83 0.28 0.50 0.29 0.50 0.30 0.38 0.28 0.44 0.32 0.33

A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A A2 Circuit Whip 27 Recept, CB# N/A

A2 Lighting Panel

XFMR

Lighting Panel A-1

Junction Box

XFMR

Boiler Fan Decay

Water Lines (Pipes)

Weld Receptacle

Boiler Fan Disconnect

Boiler Fan Motor

PLC Cabinet

Monitoring Solutions

XFMR

Tank

Valves

Cooling Area (Area 16) Cooling Area (Area 16) Cooling Area (Area 16) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18) Vac Pan Area (Area 18)

50K Tank 50K Tank 50K Tank

0.41

N/A N/A N/A

119.00 365.00

Reclaim Pump Motor

0.49 0.67 0.39 0.49 1.71 0.30 0.32 0.35 0.27 0.58 0.27 2.10 0.47 9.50 1.36 1.41

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

Reclaim Pump Disconnect Condensate Pressure Pump

Vac Pump

#4 Purge Pump

#4 Exhauster Motor

#4 Condensate Motor Evaporator Feed Motor

#3 Exhauster #2 Exhauster #1 Exhauster

Slurry Pump Motor

Screw Motor

Filter Wheel Motor

3rd Floor Lighting Panel 1 3rd Floor Lighting Panel 2

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 14 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-04 (Continued) Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19) Bagging/Packaging Area (Area 19)

91 92 93 94 95 96 97 98 99

Pellet Bagger

1.08 0.97 1.10 1.02 0.98 1.05 1.17 1.58 1.01 1.07 0.66 0.67 0.77 0.71 0.70 0.62 0.52 0.78 0.63 0.56 0.49 1.41 0.72 0.49 1.35 0.46 0.51 0.48 0.50 0.56 0.53 0.51 0.72 0.49 0.54 0.44 0.46 0.97 0.67 0.78 0.92 0.83

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

Elevator

Pellet Kicker

Newlong Bagger Newlong Elevator

Tunnel Screw

Newlong Electric Cabinet

Newlong PLC

Pellets Electric Cabinet

100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132

Pellets Vibrator DC Electric Cage

DC Bagger

Disconnects behind DC

DC Kicker

DC Elevator

Mollers Electric Cabinet

Molllers Frame

Mollers Reject Motor Mollers Scale Motor

Mollers Bag Turner

Mollers Pusher Frame

Mollers Pallet Dispenser

Mollers Slip Sheeter

Pellets Lower Disconnect

Pellets Curve Belt

Pellets Pallet Dispenser

DC Pallet Dispenser

DC Frame DC Pusher

Pellets Crane

Pellets Bag Turn Cabinet DC Bag Turn Cabinet DC Electric Cabinet Pellets Electric Cabinet

Pellets Stretch Wrap

Pellets Stretch Disconnect

Pellet Top Sheeter DC Top Sheeter DC Stretch Wrap

DC Stretch Wrap Disconnect

Mollers Top Sheeter Mollers Stretch Wrap

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 15 of 23

INTERSTATES MONTH XX, XXXX

Drawing E08-05 Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21)

1 2 3 4 5 6 7

Tank 4 Tank 3 Tank 7 Tank 6 Tank 5

11.56

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

3.58

10.90

1.58 0.36 1.35

XFMR by Tank 5

Step Frame

900.00

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 16 of 23

INTERSTATES MONTH XX, XXXX

Section 3: Appendix A: Planview Drawings

The following planviews show the overall facility broken down into individual drawings. Each drawing show’s locations on site for the areas in which touch resistance tests were conducted as well as the test points where the clamp on meter was used for ground resistance. Note that the backgrounds for these drawings are schematic in nature and are intended to show the areas tested and the approximate ground locations for some points. These drawings should not be used for exact measurements or scaling.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 17 of 23

INTERSTATES MONTH XX, XXXX

SEE DRAWING E08-02 FOR DETAILS

SEE DRAWING E08-03 FOR DETAILS

SEE DRAWING E08-04 FOR DETAILS

OVERALL GROUNDING PLANVIEW

SCALE: 1"=40'-0"

0 20'

40'

80'

SEE DRAWING E08-05 FOR DETAILS

ISSUED FOR REFERENCE THIS DRAWING SHALL NOT BE SCALED UNLESS PLOTTED ON 24"x36" PAPER.

DRN DATE:

8-26-20

Client Logo Here

GROUNDING STUDY CARGILL AKRON, OHIO CLIENT NAME FACILITY LOCATION

DRN BY:

02-20-7212

MDS JDB

ENGR BY:

JOB NO.

SIOUX CENTER, IA 51250 PHONE: (712) 722-1664 E-MAIL: ENG@INTERSTATES.COM 538 12th STREET NE. ENGINEERING

CKD BY:

E08-01 0

OVERALL GROUNDING PLANVIEW

CKD DATE:

A ISSUED FOR REFERENCE

JDB MDS 8-26-20

NO

REVISION

ENGR

DRN

DATE

NO

REVISION

ENGR

DRN

DATE

DRAWING NO.

REV.

6

9

8

7

5

4

GROUNDING PLANVIEW

SCALE: 1/16"=1'-0"

0 8' 16'

32'

ISSUED FOR REFERENCE THIS DRAWING SHALL NOT BE SCALED UNLESS PLOTTED ON 24"x36" PAPER.

DRN DATE:

8-26-20

Client Logo Here

GROUNDING STUDY CARGILL AKRON, OHIO RING GROUNDING PLANVIEW CLIENT NAME FACILITY LOCATION

DRN BY:

02-20-7212

MDS JDB

ENGR BY:

JOB NO.

SIOUX CENTER, IA 51250 PHONE: (712) 722-1664 E-MAIL: ENG@INTERSTATES.COM 538 12th STREET NE. ENGINEERING

CKD BY:

E08-02 0

CKD DATE:

A ISSUED FOR REFERENCE

JDB MDS 8-26-20

NO

REVISION

ENGR

DRN

DATE

NO

REVISION

ENGR

DRN

DATE

DRAWING NO.

REV.

20

10 11

2

3

1

17

GROUNDING PLANVIEW

ISSUED FOR REFERENCE THIS DRAWING SHALL NOT BE SCALED UNLESS PLOTTED ON 24"x36" PAPER.

SCALE: 1/16"=1'-0"

0 8' 16'

32'

DRN DATE:

8-26-20

Client Logo Here

GROUNDING STUDY CARGILL AKRON, OHIO RING GROUNDING PLANVIEW CLIENT NAME FACILITY LOCATION

DRN BY:

02-20-7212

MDS JDB

ENGR BY:

JOB NO.

SIOUX CENTER, IA 51250 PHONE: (712) 722-1664 E-MAIL: ENG@INTERSTATES.COM 538 12th STREET NE. ENGINEERING

CKD BY:

E08-03 0

CKD DATE:

A ISSUED FOR REFERENCE

JDB MDS 8-26-20

NO

REVISION

ENGR

DRN

DATE

NO

REVISION

ENGR

DRN

DATE

DRAWING NO.

REV.

PELLET MANUFACTURING

19

18

72 73 74

ELECTRIC ROOM

COOLING TOWER

14

13

POWER HOUSE

16

12

15

GROUNDING PLANVIEW

SCALE: 1/16"=1'-0"

0 8' 16'

32'

ISSUED FOR REFERENCE THIS DRAWING SHALL NOT BE SCALED UNLESS PLOTTED ON 24"x36" PAPER.

DRN DATE:

8-26-20

Client Logo Here

GROUNDING STUDY CARGILL AKRON, OHIO RING GROUNDING PLANVIEW CLIENT NAME FACILITY LOCATION

DRN BY:

02-20-7212

MDS JDB

ENGR BY:

JOB NO.

SIOUX CENTER, IA 51250 PHONE: (712) 722-1664 E-MAIL: ENG@INTERSTATES.COM 538 12th STREET NE. ENGINEERING

CKD BY:

E08-04 0

CKD DATE:

A ISSUED FOR REFERENCE

JDB MDS 8-26-20

NO

REVISION

ENGR

DRN

DATE

NO

REVISION

ENGR

DRN

DATE

DRAWING NO.

REV.

21

GROUNDING PLANVIEW

SCALE: 1/16"=1'-0"

0 8' 16'

32'

ISSUED FOR REFERENCE THIS DRAWING SHALL NOT BE SCALED UNLESS PLOTTED ON 24"x36" PAPER.

DRN DATE:

8-26-20

Client Logo Here

GROUNDING STUDY CARGILL AKRON, OHIO RING GROUNDING PLANVIEW CLIENT NAME FACILITY LOCATION

DRN BY:

02-20-7212

MDS JDB

ENGR BY:

JOB NO.

SIOUX CENTER, IA 51250 PHONE: (712) 722-1664 E-MAIL: ENG@INTERSTATES.COM 538 12th STREET NE. ENGINEERING

CKD BY:

E08-05 0

CKD DATE:

A ISSUED FOR REFERENCE

JDB MDS 8-26-20

NO

REVISION

ENGR

DRN

DATE

NO

REVISION

ENGR

DRN

DATE

DRAWING NO.

REV.

Section 3: Appendix B: Photos

W

The following sheets show photos of the ground whips and/or ground connections to either electrical equipment or structural steel. The following equipment had a reading over the recommended critical limit of 5 Ohms or was noted as having another issue. The description on each photo indicates the planview drawing and/or test point table the ground connection can be located on. It also shows the specific test point on the table and/or planview which identifies a piece of electrical equipment or ground connection point.

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 23 of 23

INTERSTATES MONTH XX, XXXX

Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18-19 Page 20-21 Page 22-23 Page 24-25 Page 26-27 Page 28

www.interstates.com

Powered by