Grounding Audit Report | Interstates

Drawing E08-05 Test Points

Area

Point

Equipment Tested

Test Value (Ohms)

Grounded Circuit Used

Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21)

1 2 3 4 5 6 7

Tank 4 Tank 3 Tank 7 Tank 6 Tank 5

11.56

Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A

3.58

10.90

1.58 0.36 1.35

XFMR by Tank 5

Step Frame

900.00

CLIENT NAME, FACILITY LOCATION GROUNDING REPORT

Page 16 of 23

INTERSTATES MONTH XX, XXXX

Powered by