Drawing E08-05 Test Points
Area
Point
Equipment Tested
Test Value (Ohms)
Grounded Circuit Used
Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21) Brine Tanks Area (Area 21)
1 2 3 4 5 6 7
Tank 4 Tank 3 Tank 7 Tank 6 Tank 5
11.56
Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A Unknown Panel, CB# N/A
3.58
10.90
1.58 0.36 1.35
XFMR by Tank 5
Step Frame
900.00
CLIENT NAME, FACILITY LOCATION GROUNDING REPORT
Page 16 of 23
INTERSTATES MONTH XX, XXXX