Arc Flash Report | Interstates

Revisions & Table of Contents

Revisions:

Revision

Date

Prepared By Reviewed By

Comments Initial Issue

x

x/xx/xxxx

Full Name

Full Name

NOTE: Changes made for the most recent revision will be shown in grey for text and clouded on tables, one-lines and TCCs.

Table of Contents:

Section 1: Project Overview

Executive Summary

Scope of Work Clarifications

Section 2: Results

Recommendations Arc Flash Results

o Normal Scenario o Reduced Energy Let Through o Emergency Scenario (Generator Powered)

Short Circuit Results

o Bus 3 Phase Results o Device 3 Phase Results

Protective Device Coordination

Section 3: Appendices

• Appendix A: Arc Flash Technical Information

Appendix B: Model One-Lines

• Appendix C: Coordination Curves • Appendix D: Model Input Data Report

Appendix E: Abbreviations

• Appendix F: Short Circuit Remediation

SITE NAME ARC FLASH STUDY

Page 2 of 77

INTERSTATES DATE

Powered by